Jump to content
SingaporeBikes.com Telegram Now LIVE! Join NOW for the Last Reviews, News, Promotions & Offers in Singapore! ×
  • Join SingaporeBikes.com today! Where Singapore Bikers Unite!

    Thank you for visiting SingaporeBikes.com - the largest website in Singapore dedicated to all things related to motorcycles and biking in general.

    Join us today as a member to enjoy all the features of the website for FREE such as:

    Registering is free and takes less than 30 seconds! Join us today to share information, discuss about your modifications, and ask questions about your bike in general.

    Thank you for being a part of SingaporeBikes.com!

Recommended Posts

Posted
Originally posted by Scorpione_phantom@Mar 27 2006, 03:39 PM

see how first. maybe sharing with my fren.

u sharing with which fren?? AH ZHI ah

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

  • Replies 25.9k
  • Created
  • Last Reply

Top Posters In This Topic

  • Aalex82

    4464

  • Murphy

    2587

  • siaoguy75

    2219

  • FaStMaChiNe32

    1358

Top Posters In This Topic

Posted Images

Posted
Originally posted by baby devil@Mar 27 2006, 03:43 PM

haiz yo u really pig ei ...

u callin who pig??

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

Posted

OUTING TO CAMERON HIGHLANDS

 

Date:29th APRIL '06 to 1st MAY '06

 

NOTE: ONLY OPEN FOR CLASS 2A & 2

 

Travelling speed: abt 150km/h or more for N-S highway onli..

trunk road will be slower..

 

Duration: 2D2N(3D2N)

 

Meet up venue: GP Esso

 

Meet up Time: 0445 HRS

 

Move off Time: 0515 HRS

 

Total Distance Covered(2-way Trip): Est 1200km

 

Key Stop Point for resting, Petrol and food (subject to changes)..

1. 1st stop at Pagoh R&R

2. 2nd stop at Seremban R&R

3. 3rd stop at Rawang R&R

4. 4th stop at Tapah R&R Shell

5. Taking Simpang Pulai to Cameron

 

Key Stop Point when returning from Cameron to KL

1. 1st stop at Tapah R&R BP petrol

 

Key stop point when return from KL to SG

1. 3rd stop at Seramban R&R Petronas

2. 4th stop at Pagoh R&R Shell(from here, there may have spliting into 2 grps. one take 2nd link back sg, the other grp taking causeway back sg.)

 

 

Itinery(JUZ UPDATED!!!):

29/04/06

1. reach Cameron @ 1330 and check in.(we will take abt 7 hours plus to reach Cameron Highland from GP esso.)

2. Go have lunch and visit strawberry farm @ 1430

3. dinner at Brinchang town & nite pasar malam @ 1800

 

30/04/06 (2nd day)

1. checkout @ 1200

2. visit to Bee farm, Boh Tea Plantation and sight seeing.

3. Make our way back down to KL @ 1500

4. visit TIMES SQUARE at KL and hav dinner @ 1630

5. return to singapore @ 2100

 

 

Confirm List

 

1. Alex and gf(93666034)

2. Simon & Wife

3. Scorpione_phantom

4. Murphy

5. Ah Fai (91839830)

6. Fast^machine32 & gf

7. Alan_See (97967730)

8. Alan_See Fren

9. jeff & wife

10. devil_spirit

 

Total Confirm(s) : 14 persons

Total Bike(s) : 9 Bikes

 

one ROOM per nite cost SGD70

 

Apartment 1

 

Rm 1: Aalex82 & gf

Rm 2: Simon & Wife

Rm 3: Murphy & Scorpione & devil_spirit

 

Apartment 2

 

Rm 1: Fast^Machine32 & gf

Rm 2: jeff & wife

Rm 3: Alansee and his friend

 

Apartment 3

 

1.

2.

3.

 

 

Pending List

 

1. wangfh81 (98315140)

2. Lao Yang (Murphy Fren)

3.

 

 

Total pending(s) : 3 Persons

 

 

let me start the ball rolling !!

 

who wanna stay at KL for 1 more night !

_______CFm List________

1: Fast^Machine32 & gf

2: Simon & Wife

3: Murphy

4: Aalex82 & gf

5. Scorpione

6: jeff & wife

7: devil_spirit

 

Total Staying OverNight: 9 Person(s)

 

 

 

Note: Pls leave down your contacts if you are first time joining our grps. Tks!

 

Closing date: 30 March 2006(need to confirm and collect money for accommodation early to avoid disappointment cos the trip fall on holiday season)

 

Meet up for money collection and trip briefing on 31th March '06 @KKFC 2230HRS

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

Posted

OUTING TO CAMERON HIGHLANDS

 

Date:29th APRIL '06 to 1st MAY '06

 

NOTE: ONLY OPEN FOR CLASS 2A & 2

 

Travelling speed: abt 150km/h or more for N-S highway onli..

trunk road will be slower..

 

Duration: 2D2N(3D2N)

 

Meet up venue: GP Esso

 

Meet up Time: 0445 HRS

 

Move off Time: 0515 HRS

 

Total Distance Covered(2-way Trip): Est 1200km

 

Key Stop Point for resting, Petrol and food (subject to changes)..

1. 1st stop at Pagoh R&R

2. 2nd stop at Seremban R&R

3. 3rd stop at Rawang R&R

4. 4th stop at Tapah R&R Shell

5. Taking Simpang Pulai to Cameron

 

Key Stop Point when returning from Cameron to KL

1. 1st stop at Tapah R&R BP petrol

 

Key stop point when return from KL to SG

1. 3rd stop at Seramban R&R Petronas

2. 4th stop at Pagoh R&R Shell(from here, there may have spliting into 2 grps. one take 2nd link back sg, the other grp taking causeway back sg.)

 

 

Itinery(JUZ UPDATED!!!):

29/04/06

1. reach Cameron @ 1330 and check in.(we will take abt 7 hours plus to reach Cameron Highland from GP esso.)

2. Go have lunch and visit strawberry farm @ 1430

3. dinner at Brinchang town & nite pasar malam @ 1800

 

30/04/06 (2nd day)

1. checkout @ 1200

2. visit to Bee farm, Boh Tea Plantation and sight seeing.

3. Make our way back down to KL @ 1500

4. visit TIMES SQUARE at KL and hav dinner @ 1630

5. return to singapore @ 2100

 

 

Confirm List

 

1. Alex and gf(93666034)

2. Simon & Wife

3. Scorpione_phantom

4. Murphy

5. Ah Fai (91839830)

6. Fast^machine32 & gf

7. Alan_See (97967730)

8. Alan_See Fren

9. jeff & wife

10. devil_spirit

 

Total Confirm(s) : 14 persons

Total Bike(s) : 9 Bikes

 

one ROOM per nite cost SGD70

 

Apartment 1

 

Rm 1: Aalex82 & gf

Rm 2: Simon & Wife

Rm 3: Murphy & Alansee and his friend

 

 

Apartment 2

 

Rm 1: Fast^Machine32 & gf

Rm 2: jeff & wife

Rm 3: Scorpione & devil_spirit

 

Apartment 3

 

1.

2.

3.

 

 

Pending List

 

1. wangfh81 (98315140)

2. Lao Yang (Murphy Fren)

3.

 

 

Total pending(s) : 3 Persons

 

 

let me start the ball rolling !!

 

who wanna stay at KL for 1 more night !

_______CFm List________

1: Fast^Machine32 & gf

2: Simon & Wife

3: Murphy

4: Aalex82 & gf

5. Scorpione

6: jeff & wife

7: devil_spirit

 

Total Staying OverNight: 9 Person(s)

 

 

 

Note: Pls leave down your contacts if you are first time joining our grps. Tks!

 

Closing date: 30 March 2006(need to confirm and collect money for accommodation early to avoid disappointment cos the trip fall on holiday season)

 

Meet up for money collection and trip briefing on 31th March '06 @KKFC 2230HRS

Posted

sian lei... donno wanna go anot...

no money no cai how to go... lolzx

2002-2003 aprillia rs125

2003-2008 Honda SP

2005-2006 Yahama 125z

2006-2006 Yahama R1 2001

2006-2011 Suzuki Gxsr1000 K6

2007-2007 Aprillia RS250

2008-2011 Suzuki Gxsr1000 K8

2011-2013 aprillia RSV4

2011-now ktm 525sm

2013-now husquvana 510 sm

Posted

OUTING TO CAMERON HIGHLANDS

 

Date:29th APRIL '06 to 1st MAY '06

 

NOTE: ONLY OPEN FOR CLASS 2A & 2

 

Travelling speed: abt 150km/h or more for N-S highway onli..

trunk road will be slower..

 

Duration: 2D2N(3D2N)

 

Meet up venue: GP Esso

 

Meet up Time: 0445 HRS

 

Move off Time: 0515 HRS

 

Total Distance Covered(2-way Trip): Est 1200km

 

Key Stop Point for resting, Petrol and food (subject to changes)..

1. 1st stop at Pagoh R&R

2. 2nd stop at Seremban R&R

3. 3rd stop at Rawang R&R

4. 4th stop at Tapah R&R Shell

5. Taking Simpang Pulai to Cameron

 

Key Stop Point when returning from Cameron to KL

1. 1st stop at Tapah R&R BP petrol

 

Key stop point when return from KL to SG

1. 3rd stop at Seramban R&R Petronas

2. 4th stop at Pagoh R&R Shell(from here, there may have spliting into 2 grps. one take 2nd link back sg, the other grp taking causeway back sg.)

 

 

Itinery(JUZ UPDATED!!!):

29/04/06

1. reach Cameron @ 1330 and check in.(we will take abt 7 hours plus to reach Cameron Highland from GP esso.)

2. Go have lunch and visit strawberry farm @ 1430

3. dinner at Brinchang town & nite pasar malam @ 1800

 

30/04/06 (2nd day)

1. checkout @ 1200

2. visit to Bee farm, Boh Tea Plantation and sight seeing.

3. Make our way back down to KL @ 1500

4. visit TIMES SQUARE at KL and hav dinner @ 1630

5. return to singapore @ 2100

 

 

Confirm List

 

1. Alex and gf(93666034)

2. Simon & Wife

3. Scorpione_phantom

4. Murphy

5. Ah Fai (91839830)

6. Fast^machine32 & gf

7. Alan_See (97967730)

8. Alan_See Fren

9. jeff & wife

10. devil_spirit

 

Total Confirm(s) : 14 persons

Total Bike(s) : 9 Bikes

 

one ROOM per nite cost SGD70

 

Apartment 1

 

Rm 1: Aalex82 & gf

Rm 2: Simon & Wife

Rm 3: Murphy & Scorpione & devil_spirit

 

 

Apartment 2

 

Rm 1: Fast^Machine32 & gf

Rm 2: jeff & wife

Rm 3: Alan See & Frens

 

Apartment 3

 

1.

2.

3.

 

 

Pending List

 

1. wangfh81 (98315140)

2. Lao Yang (Murphy Fren)

3.

 

 

Total pending(s) : 3 Persons

 

 

let me start the ball rolling !!

 

who wanna stay at KL for 1 more night !

_______CFm List________

1: Fast^Machine32 & gf

2: Simon & Wife

3: Murphy

4: Aalex82 & gf

5. Scorpione

6: jeff & wife

7: devil_spirit

 

Total Staying OverNight: 9 Person(s)

 

 

 

Note: Pls leave down your contacts if you are first time joining our grps. Tks!

 

Closing date: 30 March 2006(need to confirm and collect money for accommodation early to avoid disappointment cos the trip fall on holiday season)

 

Meet up for money collection and trip briefing on 31th March '06 @KKFC 2230HRS

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

Posted
Originally posted by Scorpione_phantom@Mar 27 2006, 07:36 PM

eh wat is happening ? how come i 1 time go apartment 2 , another time go apartment 1 , keep changing.. -.-''

cos grace lor...

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

Posted
Originally posted by Scorpione_phantom@Mar 27 2006, 07:37 PM

u ride big bike then never find us one liaoz la. u no good. :nono:

ha ha

wan to join us for cameron highland? :thumb:

liew.. where got? u all oso nv jio mi... lolx! :p mmm... i cant go lei.. tt period busy sailing... haha!!

Good Foundation Comes From Good Bikes...

Posted

OUTING TO CAMERON HIGHLANDS

 

Date:29th APRIL '06 to 1st MAY '06

 

NOTE: ONLY OPEN FOR CLASS 2A & 2

 

Travelling speed: abt 150km/h or more for N-S highway onli..

trunk road will be slower..

 

Duration: 2D2N(3D2N)

 

Meet up venue: GP Esso

 

Meet up Time: 0445 HRS

 

Move off Time: 0515 HRS

 

Total Distance Covered(2-way Trip): Est 1200km

 

Key Stop Point for resting, Petrol and food (subject to changes)..

1. 1st stop at Pagoh R&R

2. 2nd stop at Seremban R&R

3. 3rd stop at Rawang R&R

4. 4th stop at Tapah R&R Shell

5. Taking Simpang Pulai to Cameron

 

Key Stop Point when returning from Cameron to KL

1. 1st stop at Tapah R&R BP petrol

 

Key stop point when return from KL to SG

1. 3rd stop at Seramban R&R Petronas

2. 4th stop at Pagoh R&R Shell(from here, there may have spliting into 2 grps. one take 2nd link back sg, the other grp taking causeway back sg.)

 

 

Itinery(JUZ UPDATED!!!):

29/04/06

1. reach Cameron @ 1330 and check in.(we will take abt 7 hours plus to reach Cameron Highland from GP esso.)

2. Go have lunch and visit strawberry farm @ 1430

3. dinner at Brinchang town & nite pasar malam @ 1800

 

30/04/06 (2nd day)

1. checkout @ 1200

2. visit to Bee farm, Boh Tea Plantation and sight seeing.

3. Make our way back down to KL @ 1500

4. visit TIMES SQUARE at KL and hav dinner @ 1630

5. return to singapore @ 2100

 

 

Confirm List

 

1. Alex and gf(93666034)

2. Simon & Wife

3. Scorpione_phantom

4. Murphy

5. Ah Fai (91839830)

6. Fast^machine32 & gf

7. Alan_See (97967730)

8. Alan_See Fren

9. jeff & wife

10. devil_spirit

 

Total Confirm(s) : 14 persons

Total Bike(s) : 9 Bikes

 

one ROOM per nite cost SGD70

 

Apartment 1

 

Rm 1: Aalex82 & gf

Rm 2: Simon & Wife

Rm 3: Murphy & Alansee and his friend

 

 

Apartment 2

 

Rm 1: Fast^Machine32 & gf

Rm 2: jeff & wife

Rm 3: Scorpione & devil_spirit

 

Apartment 3

 

1.

2.

3.

 

 

Pending List

 

1. wangfh81 (98315140)

2. Lao Yang (Murphy Fren)

3.

 

 

Total pending(s) : 3 Persons

 

 

let me start the ball rolling !!

 

who wanna stay at KL for 1 more night !

_______CFm List________

1: Fast^Machine32 & gf

2: Simon & Wife

3: Murphy

4: Aalex82 & gf

5. Scorpione

6: jeff & wife

7: devil_spirit

 

Total Staying OverNight: 9 Person(s)

 

 

 

Note: Pls leave down your contacts if you are first time joining our grps. Tks!

 

Closing date: 30 March 2006(need to confirm and collect money for accommodation early to avoid disappointment cos the trip fall on holiday season)

 

Meet up for money collection and trip briefing on 31th March '06 @KKFC 2230HRS

Posted
Originally posted by SoInLovE@Mar 27 2006, 08:18 PM

liew.. where got? u all oso nv jio mi... lolx! :p mmm... i cant go lei.. tt period busy sailing... haha!!

lolz. okie okie. some time jio u go lor. k3 very fast leh. hee

Good Game No Replay......

Posted
Originally posted by Scorpione_phantom@Mar 27 2006, 09:35 PM

-.-'' o_O

:cry: my xiao hong...so sad

25 Nov 2003 - 24 Nov 2004 (FS6087P) (NSR SP)

24 Nov 2004 - 28 Feb 2006 (FJ7457X & FJ*5**) (Hurricane & Vespa PX200)

01 Mar 2006 - 04 Jul 2006 (FS9367L, FJ7457X & FJ*5**)(CBR 919 RRW, Hurricane &Vespa PX200)

04 Jul 2006 - 13 Jun 2011 (FV8507R & FJ*5**)(Suzuki K2 & Vespa PX200)

13 Jun 2011 - Till Now (X1)

15 Jan 2013 - 10 Sept 2015 (FBG9588B)(GTR1400 2013)

Posted

wat only sia..

2002-2003 aprillia rs125

2003-2008 Honda SP

2005-2006 Yahama 125z

2006-2006 Yahama R1 2001

2006-2011 Suzuki Gxsr1000 K6

2007-2007 Aprillia RS250

2008-2011 Suzuki Gxsr1000 K8

2011-2013 aprillia RSV4

2011-now ktm 525sm

2013-now husquvana 510 sm

Posted
Originally posted by SoInLovE@Mar 27 2006, 08:18 PM

liew.. where got? u all oso nv jio mi... lolx! :p mmm... i cant go lei.. tt period busy sailing... haha!!

don say u liao le rideing ur big bike untill now olso don see u join us once b4 Faint loh ! sad sad sad :nono:

Posted
Originally posted by Murphy@Mar 27 2006, 03:49 PM

u callin who pig??

isn't it obvious that she is calling u?? hahaha... :cheeky: by the way, she and some friends join us for supper at Yishun 925 for supper quite some time ago. that was after we went to dam....

http://www.singaporebikes.com/forums/picture.php?albumid=657&pictureid=3810
Posted

good morning guys!!!

:cheer: :cheer: :cheer:

http://img814.imageshack.us/img814/3549/penguin.jpg

2001~04---> NSR-150SP(FT43**H), RXK(FD41**)

2004~06--> CBR-400RRR(FN31**R), RXK

2006~07 ---> CBR929RRY(FS35**C), RXK

2007~10 --> CBR929RRY, Wave125R(FY74**P)

2010~Present -> CBR1000RR10(FBE56**T), Wave125R

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • DAIS_ShellBAU2024_Motorcycle_SingaporeBikesBanner_300x250.jpg

     
×
×
  • Create New...