Jump to content
SingaporeBikes.com Telegram Now LIVE! Join NOW for the Last Reviews, News, Promotions & Offers in Singapore! ×
  • Join SingaporeBikes.com today! Where Singapore Bikers Unite!

    Thank you for visiting SingaporeBikes.com - the largest website in Singapore dedicated to all things related to motorcycles and biking in general.

    Join us today as a member to enjoy all the features of the website for FREE such as:

    Registering is free and takes less than 30 seconds! Join us today to share information, discuss about your modifications, and ask questions about your bike in general.

    Thank you for being a part of SingaporeBikes.com!

[Archived 2011] Sungai Rengit Seafood Trip - For the Weekdays Warrior - 28th Feb 2011


Recommended Posts

Posted

PK Sungei Rengit Seafood Trip

 

Date: 28th Feb 2011

Meet up time: 0900 hrs

Briefing: 0915hrs

Move off time: 0930

Meet up venue: GP Esso

Distance est: 250km (Both ways)

Cost: Est. RM50 per pax (Food only)

Speed travelling at: 110km/h (TA meter)

Programs: Meet up, go eat, the rest up to Kev.

 

Interested parties:

1. Lim Pei

2.

3.

4.

5.

 

 

No pending whatever so. Only put name if you confirm can come. Cut off time is 28th Feb 2011, 0700hrs.

I will not wait for any late comers. Moving out on the dot. You late also no need to call me. Either you make your way there or u-turn go home.

 

Riding attire- Minimum (Applies to both rider and pillion)

T-shirt

Jeans

Covered shoes

Open face helmet

Anyone above you don’t understand pls ask.

 

If you have put your name but feel sick on the day or do not have enough sleep the day before, Don't come!!! Anything happen to you during the trip...you take care of yourself...

 

Make sure bike is in good riding condition... only tyre repair kit is supplied.

 

Anything else not happy with how I plan the trip..please refer to my signature...Thank you

I AM BACK!!!!!

  • Replies 14
  • Created
  • Last Reply

Top Posters In This Topic

Posted

POI of the restuarant we are going N1 21.035 E104 13.254

 

Tips on convoy riding, please make an effort to read the "stickys" done by the moderators.

I AM BACK!!!!!

Posted

auto add pls. will update if +1 not.

darling hammy coming nt?

我们都在不断赶路忘记了出路, 在失望中追求偶尔的满足..

Disclaimer:

The above information is obtained from third party sources for which I assume no responsibility.

While there is no reason to believe that the information is unreliable, no liability is accepted for any errors or inaccuracies.™®©

Posted
Pls add your name in keV. You showing bad example to the rest.

 

ya lah... tsk tsk....

:nono:

我们都在不断赶路忘记了出路, 在失望中追求偶尔的满足..

Disclaimer:

The above information is obtained from third party sources for which I assume no responsibility.

While there is no reason to believe that the information is unreliable, no liability is accepted for any errors or inaccuracies.™®©

Posted

PK Sungei Rengit Seafood Trip

 

Date: 28th Feb 2011

Meet up time: 0900 hrs

Briefing: 0915hrs

Move off time: 0930

Meet up venue: GP Esso

Distance est: 250km (Both ways)

Cost: Est. RM50 per pax (Food only)

Speed travelling at: 110km/h (TA meter)

Programs: Meet up, go eat, the rest up to Kev.

 

Interested parties:

1. Lim Pei

2. Despicable Me

3.

4.

5.

 

 

No pending whatever so. Only put name if you confirm can come. Cut off time is 28th Feb 2011, 0700hrs.

I will not wait for any late comers. Moving out on the dot. You late also no need to call me. Either you make your way there or u-turn go home.

 

Riding attire- Minimum (Applies to both rider and pillion)

T-shirt

Jeans

Covered shoes

Open face helmet

Anyone above you don’t understand pls ask.

 

If you have put your name but feel sick on the day or do not have enough sleep the day before, Don't come!!! Anything happen to you during the trip...you take care of yourself...

 

Make sure bike is in good riding condition... only tyre repair kit is supplied.

 

Anything else not happy with how I plan the trip..please refer to my signature...Thank you

我们都在不断赶路忘记了出路, 在失望中追求偶尔的满足..

Disclaimer:

The above information is obtained from third party sources for which I assume no responsibility.

While there is no reason to believe that the information is unreliable, no liability is accepted for any errors or inaccuracies.™®©

Posted

PK Sungei Rengit Seafood Trip

 

Date: 28th Feb 2011

Meet up time: 0900 hrs

Briefing: 0915hrs

Move off time: 0930

Meet up venue: GP Esso

Distance est: 250km (Both ways)

Cost: Est. RM50 per pax (Food only)

Speed travelling at: 110km/h (TA meter)

Programs: Meet up, go eat, the rest up to Kev.

 

Interested parties:

1. Lim Pei

2. Despicable Me

3. Orh jiao

4.

5.

 

 

No pending whatever so. Only put name if you confirm can come. Cut off time is 28th Feb 2011, 0700hrs.

I will not wait for any late comers. Moving out on the dot. You late also no need to call me. Either you make your way there or u-turn go home.

 

Riding attire- Minimum (Applies to both rider and pillion)

T-shirt

Jeans

Covered shoes

Open face helmet

Anyone above you don’t understand pls ask.

 

If you have put your name but feel sick on the day or do not have enough sleep the day before, Don't come!!! Anything happen to you during the trip...you take care of yourself...

 

Make sure bike is in good riding condition... only tyre repair kit is supplied.

 

Anything else not happy with how I plan the trip..please refer to my signature...Thank you

I AM BACK!!!!!

  • 2 weeks later...
Posted

Not realize that this is a difference day for the outing....will see

  • 2 weeks later...
Posted

No can do, got an appointment at 10am to noon.

Posted
Back safely with keV and kev's bor.

 

yes, roads are far better than it was before when I went with thenation & co last yr.

 

thnx darling arthur for the 2nd trip.. :shy:

我们都在不断赶路忘记了出路, 在失望中追求偶尔的满足..

Disclaimer:

The above information is obtained from third party sources for which I assume no responsibility.

While there is no reason to believe that the information is unreliable, no liability is accepted for any errors or inaccuracies.™®©

Guest
This topic is now closed to further replies.

  • DAIS_ShellBAU2024_Motorcycle_SingaporeBikesBanner_300x250.jpg

     
×
×
  • Create New...